Double through wedged stub tenons dry fitted to the carcass sides. These will be trimmed flush after glue up. Tomorrow I’ll cut the tenons in the side pieces, securing the top. Then on to double tapered sliding dovetails for the drawer dividers.
by splinter | Mar 2, 2019 | 0 comments
